Qualiconsult International
United Arab Emirates+971 4 558 8610Company profile
Projects / Reference 21
International REFERENCE

High Speed Train Line Construction

South of France, France

Design review; technical inspection and complementary missions.
High Speed Train Line Construction
Image reproduced from the project reference; may show a historical or illustrative representation.
QUALICONSULT SCOPE

Design review; technical inspection and complementary missions.

Project overview

Construction of a 250 km high speed line in hilly terrain. Qualiconsult missions covered the bow-string double bridge at la Garde-Adhémar (340 m); Roquemaure viaduct (680 m); Avignon double viaduct (680 m); Cavaillon viaduct (1,500 m); Cheval Blanc viaduct (900 m); Vernègues viaduct (1,416 m); Arc viaduct (308 m, surrounding-area works); Briançon viaduct in a mountain area; and the covered cutting at l'Eurre, south of Valence.

Reference 21 · Supplied project appendix, page 24. The stated scope describes Qualiconsult’s role; historical information does not establish current status.

View original reference ↓
← All referencesNext reference →
PROJECT ENQUIRIES

Discuss your technical
review requirements.

Contact our UAE team to discuss your project,
the required disciplines and the scope of appointment.

Contact Qualiconsult